So I just got confirmation that my GTS-R is in "trim status", car is already framed. Does anyone know how long more or less before the car will be fully assembled? How soon after that before it's shipped? This is a surprise, didn't expect it this early.
Thanks!
they can sit in the factory for a few months,maybe so,maybe not
Mine arrived at VE today. I wonder if the ACR wing delays the factory had pushed mine through quicker than expected.
Official order: 10/3
Arrived @ dealer: 1/9
Hope to pick it up this weekend!
https://www.instagram.com/p/BPDLRs_hWCD/
Last edited by PkB2014; 01-09-2017 at 04:59 PM.
no voodoo,s? need to see some voodoo cars!
Received an update on my GTS-R. Car is completed and in the 'audit' phase as of last week. Excepted delivery got bumped up from May to beginning of March. One month to go.![]()
Ordered 1 of 1 ACR E on 9-29-2016 Vin # on 12-6-2016 # 571 Still in D status. Very exciting.
Ordered 1of1 on Oct 8. Just went into D status last week. No VIN yet. Delay was on my end in color selection.
So what is the best guess for build timing?
5or 6 more months
Have vin# 568 waiting to hear when start date is. Ordered on Sept. 15 no contact yet. 1of1 ACR/E . What is D status?
Viper SRT -- you have a Vin , call your Dealer. It can not go to D status without a Vin.
This page contains an explanation of Daimler Chrysler order status codes.
UNSCHEDULED
BB - fleet order only - review by bid department
BD - special equipment processing
BE - edit error - coding error which must be corrected before order can be considered for scheduling
BG - order has passed edit, but cannot be scheduled regardless of priority or sold status
F - Financial hold
B - model or option
B - build out
L - material restriction
M - material hold (fleet)
BX - good order available for scheduling
SCHEDULED
C - tentative schedule
D - firm schedule: serial number is assigned, appropriate time in station (5) working days
D1 - gateline: plant has sequenced the unit for production, estimated ship date assigned, approximate time in station is (12) working days
BUILD
E - framing
F - paint
G - trim
BUILT
I - unit is built pending final inspection
J - vehicle has passed final inspection: but not released to carrier unit requiring vendor work (sunroof, special package, etc.)
JB - shipped to body vendor
JE - shipped to emissions
JS - shipped to storage
KZ - released by plant and invoiced
TRAFFIC CODES
KZL - released but not shipped
KZM - first rail departure
KZN - first rail arrival
KZO - delayed/received
KZT - second rail departure
KZU - second rail arrival
KZX - delivered to dealer
Last edited by HISSSN1; 02-06-2017 at 10:17 PM.
In reality with a Viper most of the letters seem to be skipped , as it is not a normal production line , so once it goes to D1, the normal progression is E, then jumps right to G, and then I ( normally called Final Inspection , when the exact term is Pending Final Inspection). Once it goes to J once can usually assume it has passed and likely actually is in storage, though one will occasionally see a Viper actually listed in JS. Ebb and flow , a movement to J, is normally followed by a KZ designation ------ pretty much ends there as the other notations are based on rail shipments and we know Vipers come via Reliable Carriers. Normally , even when delivered to a Dealer the KZ designation stays ( occasionally it will show a KZX ,but it is actually infrequent).
Big key for Viper owners, is once in D you will have a Vin number.
Good data thanks guys...
Only 180 days until status DE, or Dinosaur extinction.