Morgan Day our Viper Tech and Dominik Vo have been humming along these last few days installing our Tractive suspension package and some of our heads and cam kits so I thought that I would run a time lapse video today and see what it looked like.
The video begins at roughly 7:30am and ends around 5:00pm. With both guys on one build this is about a 1 day job for us at this point without interuption. You will see another ACR and forum member here come in for a warranty repair that ate up a little time. All the heads and cam build needs at this point is the hood, some heat cycles, the ECU back from Winkles and some road miles to verify everything is happy.
Fun to watch a pro do his thing. I will have to do this again sometime.
Andy
Bookmarks