We received our Triple disc we've been working with Mantic Clutch on as well as our CNC supercharger brackets yesterday! Time to get back to work!
was curious to see if stock would hold on base kit.
How's that tuning going, AntiLag?
Nice, was a little sad seeing this on hold waiting for parts. Think this thing might actually be all together, running and tuned by the end of next week?
Closer closer! Going ahead and getting the CNC'd parts anodized so we don't have to take them off again! Here's the latest with the air box concept
wow , love the design ! smart.
Brackets and pulley back from Anodize and black F1X on the way
Moe's money is burning a hole through his pocket, from Dubai all the way to Texas!
Should be able to start up with the blower mounted by the end of the week. Tuning will be a little more time though as we document everything, test, coat items, and work on install instruction as we go along
Looking better by the minute... Can't wait to see the results!!
Determined to start this thing up tomorrow! Got the base bracket installed and crank pulley installed today. Little bit of hardware to grab and the blower will be in tomorrow!
Just a tad over 2 months, excellent work. Subscribed
Last edited by Space Truckin; 10-27-2015 at 10:06 PM.
Beautiful work. I can't wait to see the results.
it'll be tough waiting for the arrow SC knowing this is available.
Arrow going to be a centrifugal or a twin screw?
A screw is the way to go but this centrifugal looks pretty good and in the end, a bird in the hand is worth two in the bush.
Bookmarks